[UPDATED May-2026] Best Value Available Preparation Guide for CTS-I Exam [Q135-Q160]

Share

[UPDATED May-2026] Best Value Available Preparation Guide for CTS-I Exam

1 Full CTS-I Practice Test and 480 Unique Questions, Get it Now!


AVIXA CTS-I Exam Certification Details:

Schedule ExamPearson VUE
MemberExam Price$475(USD)
Exam CodeCTS-I
Number of Questions110
Sample QuestionsAVIXA CTS-I Sample Questions
Non-Member Exam Price$575(USD)
Books / TrainingCandidate Handbook


AVIXA CTS-I - Installation Exam Syllabus Topics:

TopicWeight
Duty A: Conducting Pre-Installation Activities20%
Task 1: Review Audiovisual Project Documentation4%
Task 2: Conduct Technical Site Survey4%
Task 3: Prepare for Audiovisual Installation4%
Task 4: Evaluate Overall Facility Readiness4%
Task 5: Conduct On-Site Preparations for Installation4%
Duty B: Conducting Site Rough-In/First-Fix10%
Task 1: Deinstallation of Existing Equipment and cabling2%
Task 2: Mount Substructure4%
Task 3: Pull Cable4%
Duty C: Installing Audiovisual Systems38%
Task 1: Assemble AV Rack4%
Task 2: Wire the AV Equipment Rack5%
Task 3: Distribute AV Equipment4%
Task 4: Mount AV Equipment4%
Task 5: Terminate Cables5%
Task 6: Configure Network Properties of Equipment4%
Task 7: Load Configuration and Control Programs4%
Task 8: Test the AV System4%
Task 9: Calibrate the AV System4%
Duty D: Perform Systems Close Out11%
Task 1: Demonstrate to Client or Client's Representative that System Performs to Specifications4%
Task 2:Provide Training on System Operation4%

 

NEW QUESTION # 135
Checking an electrical system for a _____ should only be performed with the aid of a qualified electrician.

  • A. Neutral/ground swap
  • B. Hot/neutral swap
  • C. Hot/ground swap
  • D. Open ground-wiring error

Answer: A


NEW QUESTION # 136
Heat dissipated by equipment in an AV rack is measured in:

  • A. BTU/H
  • B. Coulombs
  • C. Degrees
  • D. Watts

Answer: A


NEW QUESTION # 137
When drilling is necessary, what is the purpose of pilot holes?

  • A. To check for electrical wiring
  • B. To assess the strength of the mounting material
  • C. To wear out the smaller drill bits before the larger ones
  • D. To give the screws direction

Answer: D


NEW QUESTION # 138
When should you run electrical and signal cables to a flat panel display?

  • A. Before you've found all of the studs behind the mounting wall
  • B. Once you've placed it upon a flat, clean, shipping blanket
  • C. After it's been mounted to the wall
  • D. After you've made final adjustments to the display based on the viewing environment

Answer: C


NEW QUESTION # 139
Which device provides a direct physical connection between multiple nodes?
Response:

  • A. Router
  • B. Gateway
  • C. Bridge
  • D. Switch

Answer: D


NEW QUESTION # 140
The point at which power enters a building is called the _____.

  • A. hot spot
  • B. facility drop
  • C. service entrance
  • D. demark

Answer: C


NEW QUESTION # 141
The most common type of Viewing Category is __________.

  • A. Basic Decision Making (BDM)
  • B. Analytical Decision Making (ADM)

Answer: A


NEW QUESTION # 142
The key elements of a project should be driven by:

  • A. The deadline for completion
  • B. The cost of materials
  • C. The overall budget
  • D. The client's need

Answer: D


NEW QUESTION # 143
Items which require user control should be placed in the _____ of the rack.

  • A. Bottom
  • B. very top
  • C. back
  • D. middle

Answer: D


NEW QUESTION # 144
The connector pictured below is known as:

Response:

  • A. Insulation displacement
  • B. Captive screw compression termination
  • C. Direct connection termination
  • D. Ancillary dimpled solder connection

Answer: B


NEW QUESTION # 145
If the projector you have to install is discontinued by the manufacturer, what should you do?
Select all that apply.
Response:

  • A. Try to find the specific model through an online vendor
  • B. Discuss the need for change with the AV designer and your project manager
  • C. Install another similar model and record the model number on the project documentation
  • D. Redline the change on the appropriate project document, send it to your project manager for submission of a formal RFI or RFC, and wait for a CO

Answer: B,D


NEW QUESTION # 146
What is a ground loop?
Response:

  • A. An electrical connection between any grounded conductor and any non-current-carrying metal object
  • B. A continuous isolation between receptacles and electrical circuits
  • C. An interruption of a cable shield connection
  • D. An electrically conductive area that has two or more ground reference connections

Answer: D


NEW QUESTION # 147
Before entering a construction site, safety coordination and requirements should be discussed with the:

  • A. plumbing contractor
  • B. electrical contractor
  • C. general contractor
  • D. network contractor

Answer: C


NEW QUESTION # 148
Oscillating symbol 'tilde' ~ with Resistor IMAGE
WHAT IS IS?

  • A. DC Circuit
  • B. AC Circuit
  • C. Parallel Circuit
  • D. Series Circuit

Answer: B


NEW QUESTION # 149
In a loudspeaker circuit, what color wire carries the negative (-) current?

  • A. Red
  • B. Grey
  • C. White
  • D. Black

Answer: D


NEW QUESTION # 150
What type of drawing view shows the layout of items on the ceiling?
Response:

  • A. Elevation drawing
  • B. Reflected ceiling plan
  • C. Reflected floor plan
  • D. Detail ceiling drawing

Answer: B


NEW QUESTION # 151
How would a commissioning technician establish substantial completion/practical completion?

  • A. Generate a list of all damaged equipment, setting up the DSP
  • B. Generate a punch or defects list, getting architects to sign off on repairs
  • C. Complete a request for changes form, filing an RFQ
  • D. Complete all preliminary tests, confirm systems installation and readiness for final test

Answer: D


NEW QUESTION # 152
Which of the following choices lists the correct pinouts for the T-568A end of a crossover network cable (pin
1-8):

  • A. WGr, Gr, WOr, B, WB, Or, WBr, Br
  • B. Gr, WGr, WOr, B, WB, Or, WBr, Br
  • C. Br, WBr, Or, WB, B, WOr, GR, WGr
  • D. WOr, Or, WGr, B, WB, Gr, WBr, B

Answer: A


NEW QUESTION # 153
Which of the following can be used to automatically turn off unused microphones?

  • A. Absorbers
  • B. filters
  • C. gates
  • D. limiters

Answer: C


NEW QUESTION # 154
Where should a line driver be installed?

  • A. Near the destination
  • B. By the source of the noise
  • C. In the middle of the signal pathway
  • D. Near the source

Answer: D


NEW QUESTION # 155
_____ draws the video image on the display in a sequence of lines from top to bottom.
Response:

  • A. Frame rate
  • B. Progressive scanning
  • C. Interlaced scanning
  • D. Refresh rate

Answer: B


NEW QUESTION # 156
A(n) _____ is a graphical representation of the microphone's directionality and electrical response characteristics.

  • A. frequency response specification chart
  • B. polar plot
  • C. performance criteria circle graph
  • D. electrical output level diagram

Answer: B


NEW QUESTION # 157
What is a characteristic of multimode fiber optic cables?

  • A. Multimode uses yellow cable jackets
  • B. Multimode cable does not have limited bandwidth
  • C. Multimode cables send the signal quicker than single-mode cables
  • D. Multimode disperses the signal into many light paths

Answer: D


NEW QUESTION # 158
For an ethernet cable (UTP) to meet certification standards, the maximum length is Response:

  • A. 98, or 30m
  • B. 492, or 150m
  • C. 328, or 100m
  • D. 984, or 300m

Answer: C


NEW QUESTION # 159
What is an advantage of using an adjustable ceiling mount support structure?

  • A. Prevents a mount from separating
  • B. Allows the set screws to stabilize
  • C. Lowers the mount for easy projector maintenance
  • D. Allows for flexibility in the location of the mount

Answer: D


NEW QUESTION # 160
......